Skip to content
Alicerce

Build or buy: the cost comparison calculator

Land, design, permits and construction — always as ranges, never false precision — against the price of an equivalent home already built.

Purchase price of the building plot — €0 if you already own it.

Building system
Zone

≈ €1,300 – €1,850 /m² turnkey applied in this zone, 14–18 months of estimated build time.

You finance the land purchase — registration costs follow the deed-with-mortgage figures.


For comparison: an equivalent ready-built home

An already-built home, same size and zone.

Exempts IMT and stamp duty (Imposto do Selo) in the buy-ready scenario — for a fair comparison.

Building should cost you

€267,155 – €362,455

Buy ready-built

€400,052

Difference

building costs between €37,597 and €132,897 less

14–18 months to build vs 2–4 months to buy.

Where this range comes from

Land€60,000
IMT on the land (6.5%)€3,900
Stamp duty on the land purchase (0.8%)€480
Land registration€375
Architecture and engineering designEstimated range€4,000 – €9,000
Municipal licensing feesVaries a lot by municipality — estimated range€2,000 – €7,000
Construction (Traditional)Estimated range, VAT included in the €/m² turnkey price€195,000 – €277,500
Site management and inspectionEstimated range€1,000 – €3,000
Occupancy permit + final registrationEstimated range€400 – €1,200
Estimated total to build€267,155 – €362,455

Estimated ranges based on 2026 market bands — always get 2–3 real quotes. 23% VAT included in the €/m² turnkey price.

The new RJUE (DL 108/2026) — Regime Jurídico da Urbanização e Edificação, Portugal’s building-licensing framework — takes effect on 3 August 2026 and changes licensing procedures.

Why this always comes as a range

The "turnkey" price per m² that any builder quotes you includes materials, labour, standard finishes and the 23% VAT on the works. What is left out — and what most people forget — is the land, the design (architecture and engineering), the municipal fees for licensing, and the utility connections, which vary from plot to plot.

There are three building systems, each with a different cost and timeline profile. Traditional masonry runs between €1,300 and €1,850/m², with a build of 14 to 18 months. LSF (Light Steel Framing) runs between €1,100 and €1,800/m², but in 6 to 8 months — the gain is in the schedule, not the budget. ICF (insulated concrete formwork) runs between €1,200 and €2,000/m², with an intermediate 8 to 12 month timeline and better thermal performance.

These national bands rise 20% to 40% in Lisbon, Porto and the Algarve, and fall 10% to 20% in the interior. The land, separately, always pays IMT (property transfer tax) at the flat rate of 6.5% and stamp duty (Imposto do Selo) of 0.8% on the purchase — it doesn’t fall under the housing brackets, because for the tax authorities it is land for construction, not a house.

On top of the licensing comes the architecture and engineering design (€4,000 to €9,000) and the municipal fees (€2,000 to €7,000, with big variation between councils). A 150 m² three-bedroom (T3) house in the traditional system, national zone, on a €60,000 plot already paid in cash, comes out between €267,155 and €362,455 end to end — land, land taxes, design, fees, construction, site management and occupancy permit included. To compare against the cheque for buying an equivalent ready-built home, use the total purchase costs calculator.

Frequently asked questions

What’s included in the "turnkey" price per m²?
Materials, labour, standard finishes and the 23% VAT on the works. It does not include the land, the architecture and engineering design, municipal licensing fees, or utility connections (water, electricity, sewage), which vary by plot.
Is LSF (Light Steel Framing) really cheaper than traditional construction?
In €/m² it comes out similar or slightly lower — €1,100–€1,800/m² against €1,300–€1,850/m² for traditional masonry. The real gain isn’t in cost: it’s in time, typically 6–8 months against 14–18 months for a traditional build.
What VAT applies to building a new house?
The general rule is 23%, already included in this calculator’s €/m² turnkey bands. The reduced 6% rate applies only to specific cases — mainly urban-renovation works — not to a new build from scratch.
How much does it cost to license a new build?
Two cost blocks, separate from the build itself: the architecture and engineering design (structural, thermal, electrical, water, fire safety/SCIE) between €4,000 and €9,000, and municipal licensing fees between €2,000 and €7,000 — the latter varies a lot from one municipal council to another.
What changes with the new RJUE (DL 108/2026)?
Decree-Law 108/2026 takes effect on 3 August 2026 and reforms the RJUE (Regime Jurídico da Urbanização e Edificação — Portugal’s urban-development and building-licensing framework): it strengthens the prior-notice procedure (comunicação prévia) and changes licensing procedures at municipal councils. It doesn’t change the cost bands per m² — only the administrative path to the permit. Details in the guide to the new RJUE.

Keep going